71D0355D.html |
RA Range: ToO
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0, THK, 5.0, 1.0, 0
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
ToO program on GRB using 9 ESO instruments and aimed at studying the origin and physics of GRB events. Submitted OBs oversubscribe the allocated time, but once ToO is triggered, final observing strategy will be chosen (i.e. they will select which OBs need to be executed).
README of this run: