71.D-0355(C)
PI:van den Heuvel/ Hjorth/ Wijers/ Castro-Tirado/ Fruchter/ Greiner/ Kaper/ Kouveliotou/ Pian/ Fynbo/ Gorosabel/ Klose/ Palazzi/ Tanvir/ Vreeswijk/ Wiklind/ Boer/ Gehrels/ Hurley
Last update of this page: Mon Oct 13 17:45:09 2003
Last update of the USG file: Mar 19 23:49:39 2003
Major Instrument Modes: ISAAC SWI JHK & SWS-LR 1.2, 1.9, 2.2
RA Range: ToO
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 4THK 5.0 1.0 0.0
|
Pre-imaging run? |
No!
|
Chilean run? |
No!
|
Special calibrations? |
No!
|
|
|
Time critical? |
No!
|
ToO? |
Yes!
|
Carry-over run? |
No!
|
Special Remarks:
Associated programs:
71.D-0355A (FORS1)
71.D-0355B (FORS2)
JHK imaging and spectroscopy of GRB.
ubmitted OBs worth 16h, allocated time is 15h.
A subset of OBs will be selected at ToO activation.
Information about the progress of this run:
Run status page 71.D-0355C
README of this run:
71.D-0355C.README
Finding charts for this run:
Check if directories exist:
P69 Directory does not exist for 71.D-0355C
P70 Directory does not exist for 71.D-0355C
P71 Directory exists for 71.D-0355C
P72 Directory does not exist for 71.D-0355C