71D0284A.html |
RA Range: 16:43, 16:47
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 1PHO 1.4 0.3 60
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is a VRI imaging programme on the open cluster Wd 1. The PI has submitted 4 OBs for phot. standards. Three of them, the ones for Lan 100-362, shpuld be executed at three different airmasses during the night (Low=l, Meidum=m, High=h) and can be instersparsed with those of the OC. Another field, Lan 110-215 must be observed only once, at a similar airmass with respect to that of the OC. All the OBs (3 hrs total execution time) need to be executed during the same night. The PI says this is mandatory. For this purpose a Waiver Request was submitted and granted. The PI is aware that the conditions may degrade during the 3 hours, and he is ready to accept this.
README of this run: