71D0281E.html


Last update of this page: Thu Apr 24 17:45:06 2003
Last update of the USG file: Mar 11 11:57:07 2003

Major Instrument Modes: FORS1-IMG+LSS

RA Range: 10:18, 13:13

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 3THN 2.0 1.0 30


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? No! ToO? No! Carry-over run? No!


Special Remarks:
the OBs should be executed at the beginning of P71.


 
 
This is an IMG and LSS programme on two SNe Ia, about one
year after maximum. For each SN BVRI imaging and G300V spectra
are obtained.

Both targets should be easily visible in the acquisition image
and target centering should be pretty easy. 
For each target the PI has submitted a full field and one enlargement,
including the slit drawing. Note that in one case (2002bo) the slit
is oriented E-W, while in the other (SN2002dj) this is NS.
 

Due to target coordinates and SN luminosity decline, the OBs
should be executed at the beginning of P71.

NOTE: this programme was classified as ToO by the OPC, even if
the PI did not ask for it. This is why this is not to be considered
a ToO. All target info was available at proposal submission.

 


Information about the progress of this run:

Run status page 71.D-0281E

README of this run:

71.D-0281E.README