71D0281E.html |
RA Range: 10:18, 13:13
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 3THN 2.0 1.0 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is an IMG and LSS programme on two SNe Ia, about one year after maximum. For each SN BVRI imaging and G300V spectra are obtained. Both targets should be easily visible in the acquisition image and target centering should be pretty easy. For each target the PI has submitted a full field and one enlargement, including the slit drawing. Note that in one case (2002bo) the slit is oriented E-W, while in the other (SN2002dj) this is NS. Due to target coordinates and SN luminosity decline, the OBs should be executed at the beginning of P71. NOTE: this programme was classified as ToO by the OPC, even if the PI did not ask for it. This is why this is not to be considered a ToO. All target info was available at proposal submission.
README of this run: