71D0265A.html |
RA Range: 13h07m - 14h49m
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.4 2CLR 2.0 1.0 30.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Program to obtain FORS2 BVRI imaging and LSS spectroscopy of two type IIn supernovae. Five OBs present; one for imaging on each of the targets, and two and one for spectroscopy, respectively. Please note in the finding charts the reference object to be placed in the slit together with the SN itself. The only stringent constraint is the condition that these observations be carried out as close in time as possible, but definitely within 15 days, of the coordinated ISAAC (run 71.D-0265A; target SN 1995N only) and XMM-Newton observation on these targets. For target SN2000P, the P.I. has indicated on May 14 2003 that the XMM-Newton observations have been scheduled, so please execute the three OBs for this target as soon as possible! The XMM-Newton observations on target SN 1995N have been scheduled for the period July 24-27, so please complete this run before August 13!
README of this run: