71B0209C.html |
RA Range: 01, 06 (two objects)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 3THN 1.4 1.0 30.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
The program itself is straightforward: K-band imaging and LR/MR spectroscopy of high redshift quasars. However, please read the README file for the timing constraints: The targets should be observed at monthly intervals, therefore there are time links with programs 71.B-0209A,B. Moreover, all OBs in a given program should be observed within 1-2 days of each other.
README of this run: