71A0290C.html |
RA Range: 22:27
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 2CLR 1.6 0.2 30.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
More of the same that led to "spectacularly succesful" results in P69: dithered deep pre-imaging of a single blank field in RIz to select targets and cut masks. The follow-up spectroscopy is run (D). Standard imaging calibrations needed to select the targets from the images. Priorities: R, then I, finally z.
README of this run: