70D0023A.html |
RA Range: 03:44
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 0.2 40.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
IMPORTANT: newly added to the schedule because it has to be executed
in December.
UBVRI photometry of SN2001e1 at yet another epoch. If more than one
OB is executed in a sequence acquisition can be skipped.
TIME CONSTRAINTS:
-in order to have the longest possible time baseline, the OBs
should be executed as late as possible. Given how things went with
the related runs, it can now only be executed in December.
-all of the OBs in this run should be executed within one
week;
-ISAAC run B should be execute as close in time as possible
to run A, ideally around the following full moon.
README of this run: