70B0713A.html |
RA Range: 22:23
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
0.6 2CLR 1.5 0.1 30.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
V-band IPOL of a hot spot in radio galaxy 3c445. The target is marked on the FC. Exposure time for acquisition set to 180s after failure on November 4th. Linear polarization, four retarder retarder plate angles used: two OBs with 0 and 45 and two with 22.5 and 67.5. Standard calibrations in the calibration plan are enough. Constraints are really demanding. This run in underallocated and the rest of the time transeferred to run (B).
README of this run:
Check if ftp directory/ies exist/s for this run:
P69 Directory does not exist for 70.B-0713A
P70 Directory exists for 70.B-0713A
P71 Directory exists for 70.B-0713A
P72 Directory exists for 70.B-0713A
P73 Directory does not exist for 70.B-0713A