69D0193D.html |
RA Range: 03h 45m (single target)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 1.0 45.0
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is late-phase broadband imaging of the SN 2001e1. Please note the time requirements specified in the README file! In addition, the P.I. states that this Run is best done in early P70 (!) rather than at the end of P69. Note that the slit depicted in finding chart 69.D-0193D.003.ps has no bearing on this present Run (the figure is provided to show what the SN in its early-phase looked like and where it was).
README of this run: