69D0193C.html


Last update of this page: Thu Apr 24 17:45:05 2003
Last update of the USG file: Oct 3 04:14:59 2002

Major Instrument Modes: FORS1 IMG and LSS (fast)

RA Range: 03:44

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 0.2 35.


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? Yes!


Special Remarks:
Time links with runs (B), (C) and (D).


 
 
UBVRI imaging and 300V fast LSS of SN2001e1. This run has time
links with runs (A), (B) and (D) of the same programme to monitor
the time evolution of the source.

Time constraints: should be done as late as possible, near new moon on
5 October, i.e. at the very end of the period. All the OBs in this run
should be executed within one week.


 
 


Information about the progress of this run:

Run status page 69.D-0193C

README of this run:

69.D-0193C.README