69D0193B.html


Last update of this page: Thu Apr 24 17:45:05 2003
Last update of the USG file: Jul 17 09:43:03 2002

Major Instrument Modes: ISAAC SWI

RA Range: 03h 45m (single target)

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 1PHO 1.5 1.0 45.0 (40.0 for the J-band)


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? No!


Special Remarks:
This Run is linked in time with 69.D-0193(A,C,D)!


 
 
This is late-phase broadband imaging of the SN 2001e1.  Please note
the time requirements specified in the README file!  Note that the
slit depicted in finding chart 69.D-0193B.003.ps has no bearing on
this present Run (the figure is provided to show what the SN in its
early-phase looked like and where it was).
 
 


Information about the progress of this run:

Run status page 69.D-0193B

README of this run:

69.D-0193B.README