69D0193A.html |
RA Range: 03:44
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 0.2 35.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
UBVRI imaging and 300V+300I fast LSS of SN2001e1. This run has time links with runs (B), (C) and (D) of the same programme to monitor the time evolution of the source. Time constraints: should be done as early as possible, near new moon on 8 August. All the OBs in this run should be executed within one week.
README of this run: