69C0465A.html |
RA Range: 19:01, 21:49, 23:59
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.2 3THN 2.0 0.8 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is a LSS programme on LS-RCrA1, a faint, very late-type star. The OBs are grouped in two sets, which are meant to cover two different epochs (labelled 1st and 2nd). All OBs carrying the labels "1st" should be executed before the "2nd" set is started. All OBs within the same set should be obtained as close in time as possible. The PI suggests to have the two epochs separated in time by about 4 days, meaning that the first OB of epoch 2 should be executed about 4 days after the last OB of epoch 1. Note that the the user submitted also 6 OBs for the observation of two template stars with the same setups of the scientific target. Finding charts are provided for those two objects as well.
README of this run: