69B0255A.html |
RA Range: 10:15
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 2CLR 1.5 0.2 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is a very simple imaging program, which includes only one imaging OB for the B band. Total execution time is estimated to be 46 min. The target is a well visible QSO and the purpose of the project is to study the environment around it.
README of this run: