68D0114A.html |
RA Range: 01:24
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.8 0.4 35.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
BVRI photometry of SN200cx to follow its light curve. This run is meant to be coordinated with the IR imaging of run (B). Time constraints: all OBs of run (A) should be executed within one week because the images will be stacked to obtain one single epoch in the optical light curve. Also, run (A) -optical- and (B) -IR- should be executed as close as possible to each other, i.e. within two weeks of one another. Finally, run (A) should be executed in late 2001: December preferred, around new moon in Novembere still acceptable (see README file).
README of this run: