68D0112A.html |
RA Range: 04:40
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 0.2 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
FIMS-based LSS and IMG of SN1999em. Time critical: the aim of the program is to follow the evolution of the supernova. This run is the first epoch, 68.D-0112(B) is the second. All OBs for run (A) should be executed at the same time, i.e. within one week, and as soon as possible in the period. If the OBs are executed in a sequence re-acquisition can be skipped.
README of this run: