68C0381B.html |
RA Range: 13:05 (only)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.2 3THN 1.2 1.0 30 deg
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Long OBs (2 hours 11 min). Waiver was granted. Atmosph disp is a problem for those OBs, the PI has been told that the observer will reset the LADC regularly. The long OBs and the limit on the airmass means that the observer should not start this OB unless there are still 2 hours left above airmass 1.2, the OBs cannot be broken as it will disrupt the time-series. Note that the decl is -25:41! Hence, it may not be possible to observe across the meridian. The start of the OBs must be planned with some care I think.
README of this run: