68B0187B.html |
RA Range: 5
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2 thn 1.4 1
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Low and Medium resolution spectra of the quasar at 2.2 micron K image should be taken shortly after/before the object spectrum ! All these observing blocks should be executed in Nov 2001. ! SINCE VARIABILITY MIGHT CHANGE THE HALPHA LINE IT IS HIGHLY IMPORTANT THAT THE MEDIUM RESOLUTION THE LOW RESOLUTION SPECTRUM BE TAKEN WITHIN 1-2 DAYS FROM EACH OTHER. For each object of the project we plan to obtain a spectra at a ~1 month interval, according to associated programs 67.B-0394(A), 68-B-0197(B),(C), (D),(E),(F) Medium resolution spectrum of a telluric standard requested ! TIME-CRITICAL: TO BE EXECUTED DURING NOVEMBER
README of this run: