Major Instrument Modes: ISAAC SW imaging

RA Range: 13.5

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 3THN 1.8 1.0 40


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? No! ToO? No! Carry-over run? No!


Special Remarks:


 
 
  Long-term monitoring program in its fourth season. Simple imaging with
relaxed constraints. No photometric conditions needed, as local
standards are available.

  Execution times per OB are 1.5h. Admitted, as otherwise the OBs for
each field should be split in two to be executed on the same night, 
resulting in the same scheduling constraints and increased overheads. 

  ! Time critical: THIS PROGRAM MUST BE EXECUTED BETWEEN 17 AND 27
    FEBRUARY 2002 (THIS IS, 8-18 DAYS AFTER RUN C)


 


Information about the progress of this run:

Run status page 68.B-0129D

README of this run:

68.B-0129D.README