68B0129C.html |
RA Range: 13.5
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 3THN 1.8 1.0 40
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Long-term monitoring program in its fourth season. Simple imaging with
relaxed constraints. No photometric conditions needed, as local
standards are available.
Execution times per OB are 1.5h. Admitted, as otherwise the OBs for
each field should be split in two to be executed on the same night,
resulting in the same scheduling constraints and increased overheads.
! Time critical: THIS PROGRAM MUST BE EXECUTED BETWEEN 1 and 28
FEBRUARY 2002, AND 15-25 DAYS AFTER RUN B
! Note for MTS preparation: The time-critical information (executability
window) needs to be updated at the time of MTS preparation in view of
the execution dates of part B.
README of this run: