68B0129B.html


Last update of this page: Thu Apr 24 17:45:04 2003
Last update of the USG file: Jul 17 09:42:39 2002

Major Instrument Modes: ISAAC SW imaging

RA Range: 13.5

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 3THN 1.8 1.0 40


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? No! ToO? No! Carry-over run? No!


Special Remarks:


 
 
  Long-term monitoring program in its fourth season. Simple imaging with
relaxed constraints. No photometric conditions needed, as local
standards are available.

  Execution times per OB are 1.5h. Admitted, as otherwise the OBs for
each field should be split in two to be executed on the same night, 
resulting in the same scheduling constraints and increased overheads. 

  ! Time critical: THIS PROGRAM MUST BE EXECUTED BETWEEN 15 and 31 
    JANUARY 2002, AND 35-45 DAYS AFTER RUN B

  ! Note for MTS preparation: The time-critical information (executability
    window) needs to be updated at the time of MTS preparation in view of 
    the execution dates of part A.


 


Information about the progress of this run:

Run status page 68.B-0129B

README of this run:

68.B-0129B.README