68A0269A.html |
RA Range: 1.6h - 3.2h
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 2CLR 1.5 0.3 60
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is an imaging program consisting of three fields, two of which overlap for roughly half of the field. The program requested 0.8" seeing for the R-band images, but the quality of the results greatly improves with better seeing. The B and V images are for color, so good seeing is not as important. ! Time-critical ??: If possible, execute the R-band OB's for each field sequentially in order to have as small a change in the PSF as possible. For the A3094 and A3095 fields would be extremely helpful if all 6 of the R-band OB's could be taken sequentially, because these fields overlap. The standard calibrations requested.
README of this run: