68A0111B.html |
RA Range: 10:57, 12:05
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 2.0 0.5 90.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
MOS of two fields, four OBs per field. The targets are so faint that, most likely, they will not be visible in the through-slit image and some slits were placed on bright stars to align the mask. Please notice that on the front page of Phase 1 they asked for no lunar constraints, but grey time was specified in the "Lunar Phase Justification". Hence the OBs with FLI<=0.5 were accepted.
README of this run: