67D0134A.html


Last update of this page: Thu Apr 24 17:45:02 2003
Last update of the USG file: Jul 17 09:42:33 2002

Major Instrument Modes: FORS1 IMG, FORS1 LSS

RA Range: 1:24

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 0.4 35


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? No! ToO? No! Carry-over run? No!


Special Remarks:


 
 
Multiband imaging and LSS with 1.3" slit of SN2000cx. The contraints are
rather loose. For the imaging part, one OB is for U band, the other for BVRI.
LSS acquisition is fast and the object should be clearly visible in the 10s
acquisition image. Two spectroscopic OBs: one with 300V+GG375, the other with
300I+OG590.

The user would like the observations to be taken close to the new moon
of July 20th so as to leave enough time between run (A) and (C) of
the programme. Also, in run A, the BVRI photometry will be used to
flux-calibrate the spectra (there are secondary standards in the field),
so please execute these OBs within, say, no more than 7 days from each
other.


 
 


Information about the progress of this run:

Run status page 67.D-0134A

README of this run:

67.D-0134A.README