67D0134A.html |
RA Range: 1:24
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.5 0.4 35
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Multiband imaging and LSS with 1.3" slit of SN2000cx. The contraints are rather loose. For the imaging part, one OB is for U band, the other for BVRI. LSS acquisition is fast and the object should be clearly visible in the 10s acquisition image. Two spectroscopic OBs: one with 300V+GG375, the other with 300I+OG590. The user would like the observations to be taken close to the new moon of July 20th so as to leave enough time between run (A) and (C) of the programme. Also, in run A, the BVRI photometry will be used to flux-calibrate the spectra (there are secondary standards in the field), so please execute these OBs within, say, no more than 7 days from each other.
README of this run: