67B0611A.html |
RA Range: 1 - 23
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 PHO 1.5 1 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
SWI in K of several independent fields around GRB. Each OB lasts about 1h30: user informed that OBs will not be repeated if seeing degrades during OB execution. Note that OB on GRB 990510 can be executed under seeing 1". No standards provided. Calibration plan is sufficient.
README of this run: