67B0503B.html |
RA Range: 23.5 (single object, two fields)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 3THN 1.8 1.0 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Follow-up on a single imaging program already executed in past periods. Two fields should be observed in three different epochs: part B of the program corresponds to the first epoch (May 2001). OBs violate the 1-hour rule (1.5 hours with overhead). This has been been requested with a waiver and accepted, as dividing the OBs into two would mean having to execute them contiguously, with the same scheduling constraints and somewhat increased overhead. No special calibrations needed other than those in the calibration plan. Although the purpose is doing photometry, local standards are already available and thin cirruses are acceptable. ! The OBs for this program should appear only in the MTSs for May.
README of this run: