67B0096A.html |
RA Range: 13, 15 (object and standard)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.5 1PHO 2.0 1.0 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Continuation of a program that was already executed in period 65, MR spectroscopy in LW. Very stable conditions are needed, hence PHO transparency constraint. Time constraint: to maximize the separation of the features of interest from telluric absorption, observations should be carried out in May-June. Calibration constraint: user has provided telluric calibration stars. Two calibration OBs, one for BD5571 and one for BS4903, must be included after each science OB. This program was upgraded to class A by D. Silva and J. Breysacher taking into consideration its past history. ! THIS PROGRAM SHOULD NOT BE INCLUDED IN MTSs AFTER JULY.
README of this run: