67B0096A.html


Last update of this page: Thu Apr 24 17:45:02 2003
Last update of the USG file: Jul 17 09:42:31 2002

Major Instrument Modes: ISAAC LW spectroscopy

RA Range: 13, 15 (object and standard)

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.5 1PHO 2.0 1.0 30


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? No! ToO? No! Carry-over run? No!


Special Remarks:


 
 
  Continuation of a program that was already executed in period 65,  
MR spectroscopy in LW. Very stable conditions are needed, hence PHO
transparency constraint.

  Time constraint: to maximize the separation of the features of
interest from telluric absorption, observations should be carried out
in May-June.

  Calibration constraint: user has provided telluric calibration stars.
Two calibration OBs, one for BD5571 and one for BS4903, must be included 
after each science OB.

  This program was upgraded to class A by D. Silva and J. Breysacher
taking into consideration its past history. 


  ! THIS PROGRAM SHOULD NOT BE INCLUDED IN MTSs AFTER JULY.

 
 


Information about the progress of this run:

Run status page 67.B-0096A

README of this run:

67.B-0096A.README