RA Range: 11h30m
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0, 2CLR, 1.3, 0.5, 100
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Simple UVES observations with Dic1_346+580 of a V=16.9 QSO whose spectrum presents a DLA at z = 0.33. The comparison between optical and 21cm data (already available) will allow to further define the kinematics of the absorbing gas. Scheduling constraints: because DLA system was recently discovered to have a varying 21cm line, the last 2 OBs should be observed at least 3 weeks after the first 3 have been executed. The most critical parameter is the airmass. Two finding charts of different sizes have been provided.
README of this run: