67A0334B.html |
RA Range:0hrs
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.7 1PHO 1.5 0.5 40.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Pre-imaging of a QSO. PI requests that the seeing be between 0.5" and 0.8"! If the seeing is better than 0.5" they estimate the QSO's will be saturated in th I band. Pre-imaging need not be taken early inthe semester.
README of this run: