67A0076B.html |
RA Range: 0.4 (single target)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 2CLR 2.0 0.7 45
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
J and K imaging of four fields forming a mosaic. No special calibrations needed, no time-critical aspect. The K-band OBs exceed 1 hour of execution time by 26 min. Not clear how to circumvent this without greatly decreasing the efficiency of the program, as the 4 OBs in K are for four different positions. Since this is a class A program with not-too-demanding constraints, it seems that scheduling the long Ks OBs should not give too many problems; thus, the violation of the 1-hour rule is tolerated in this case, as confirmed by PSO.
README of this run: