66D0684A.html |
RA Range: 1:28:52
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 2CLR 2.0 0.5 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Those are two long sequences of many-many spectra read out from a windowed CCD. A waiver was granted for permission to have the long OBs, and (because of the windowing which gives less read-out-time) the PI was also allowed to count less overheads, hence the "nominal" length of the OBs (from p2pp) is somewhat over the allocation. One will need to simply count how long time the two OBs take to execute.
README of this run: