66D0571A.html |
RA Range: 1h and 5h (SMC and LMC)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Simple program with many exposures, of variable length, of targets in the SMC and LMC. Allocated time oversuscribed by about 3%, but this will almost for sure be compensated by far by grouping OBs in sequences needing just short telescope presets and no change in instrumental setup. Several OBs are time-critical. Look at the time constraints in the OB at the execution time (also at the time of preparing the MTS!). Their numbers are: 101472 101473 101474 101475 101476 101477 101478 101479 101480 A list of the time constraints has been made available to the mountain. Some OBs exceed 2 hours of execution time. Found to be acceptable in this case, as otherwise the OBs should have been executed sequentially due to variability of the target. No special calibrations required.
README of this run: