66D0549A.html |
RA Range:1hr
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.6 1PHO 1.5 0.1 90
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Waiver approved for combining 2 filters in same OB. Waiver approved for long exposures. Time constraint: PI requests the OB's need to be executed in order through the full sequence. There are two sequences in total but these two sequences do not need to be observed on the same night. I have mailed the user to explain that good seeing will be hard to maintain for the long duration of their sequences especially given the time pressure in the early part of the period when their target is visible. They have now decided that OK they cannot expect <0.6 throughout and will be happy with a median seeing of 0.8 (but left the OB's with the approved 0.6" constraint). The waiver form the mountain explains to them that although they will start the sequence when the seeing constraint of 0.6" is met they will continue to execute the OB no matter what then happens and this is understood by the PI.
README of this run: