66D0318B.html |
RA Range: 0-6 hrs
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.7 CLR 2 1 10
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
LW-I program: each OB lasts only one minute. There are 35 fields. Very large overheads. Return key set to F to save time. User is aware that due to the large overheads, this program shall be stopped once the allocated time (OPC=3 hr) gets exhausted. Although requested seeing is 0.7", user accepts it can be degraded if that helps Paranal in the execution of this program. No standards provided.
README of this run: