66D0018A.html |
RA Range: 1.6-14.5
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Simple program, one OB per object for four objects. No special calibrations needed. User indicated a "none" lunar constraint in the phase 1 proposal. This was a mistake, and it is clear from the proposal that dark time is needed. Given that this constraint is mandatory for the successful execution of a program that has been given A priority by the OPC, the change is granted.
README of this run: