66C0207A.html |
RA Range: 5
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 clr 1.6 1 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Low resolution spectroscopy in H of Beta Pic. Beta Pic should be acquired at the center of slit both in X and Y. Four standard provided to be executed each in four different nights and after a few several science OBs. All standard OBs done, left only 5 OBs on Beta Pic.
README of this run: