66B0315A.html |
RA Range: 5:19
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.6 2CLR 1.6 0.3 120
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
The IPOL OBs of this programme are somewhat longer than 1 hours. This has been approved via waiver submission. Note that this is one of the cases where both p2pp and ot calculates the wrong total execution time. I have worked with the PI go get the OBs correct, and to the best of my knowledge the OBs are now constructed to fill the total exposure time of 8 hours. It would be good if a FORS observer would cross-check.
README of this run: