66B0267A.html |
RA Range: 23:37 - 14:08
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 2CLR 1.8 0.0 60
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
LSS on bright objects. Note than in some cases (bright objects) the default acq time of 0.25 sec has been left in the OB. The PI asserts that this is intended. Change of Phase 1 target was approved by VISAS. A waiver was granted to obtain twilight flats.
README of this run: