66A0382B.html |
RA Range: 01:06 - 04:29
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 2CLR 1.4 0.3 60 deg
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Simple imaging, but with timing links to run A and C. Please remember that there were problems with the PI having swapped names of the FCs. There may, and may not, be the same problem for run B. Run A was executed on Jan 2/3. Run B must, according to the run B README file, be executed in the period 28 Jan - 3 Feb, 2001. I assume that after run B has been taken the PI expects a rapid release of the data to be able to prepare OBs for run C. Change of target relative to Phase 1 was approved by VISAS.
README of this run: