380.D-0053A


Rauw/ Sana/ De Becker/ Gosset

UVES

Last update of this page: Wed Sep 30 15:41:04 2009


Run State: COMPLETED

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Time
Critical
SHORT

Special Remarks:
OBs must be executed in pairs (one in October and one in March).

Abstract for MTS:
This is a UVES-BLUE/RED programme on the bright binary system 9 Sgr. The PI has submitted 4 OBs, two for the blue seeting and two for the red setting. They should be executed in pairs (blue+red): one pair in October (obs1_xxx) and one pair in March (obs2_xxx). Even though it would be better to have the red/blue pair executed within the same night, the PI does not put this as a strict requirement. The PI has specified the visibility windows for the two epochs: obs1: between 1 October and 3 November 2007 obs2: between 28 February and 31 March 2008


Run status page 380.D-0053A

README of this run:

Web version of approved README readme_80005300.html