Last update of this page: Wed Oct 7 15:41:04 2009
Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | ||
|---|---|---|---|---|---|---|
|
|
Special Remarks:
The two OBs must be executed on the same specific night! (see ephemeris file).
Abstract for MTS:
This is a UVES/DIC2 programme on an eclipsing binary. It includes 5
runs (ABCDE).
Run E has two OBs that have to be executed on the same night, one after the other, when the phase is between 0.9 and 0.1. The PI has supplied an ephemeris file with the suitable time windows.
Note that, as in the case of runs ABCD, run E must be executed on a different
night (i.e. none of those whan one of the ABCD runs was executed).
README of this run:
Web version of approved README readme_80053604.html