281.C-5031D


Goto/ van den Ancker/ Dullemond/ Sicilia-Aguilar/ van Boekel/ \'Abrah\'am/ Mosoni/ Henning/ Juh\'asz/ K\'osp\'al/ van Dishoeck/ Pontoppidan/ Blake/ Brown

CRIRES

Last update of this page: Wed Oct 7 15:41:04 2009


Run State: COMPLETED

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Special
Calibs
Time
Critical
DDT

Special Remarks:
Take run D as soon as possible! Take telluric after science OB. Coordinate observations with same programme at SINFONI.

Abstract for MTS:
Monitoring an outburst of Ex Lupi in the CO 4.7 um band (2 setting).
Time critical: take run D as soon as possible. Leave at least two nights between run D and E and between run E and F. If possible, do simultaneous observations with the SINFONI part of the programme!
Take telluric after science OB.
NOTE: The second finding chart of the telluric is the correct one.


Run status page 281.C-5031D

README of this run:

Web version of approved README readme_81503103.html