Last update of this page: Wed Oct 7 15:41:04 2009
Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | ||
|---|---|---|---|---|---|---|
|
|
Special Remarks:
OBs must be executed as soon as possible! Next SM slot (March 5-6-7) would be ideal.
Abstract for MTS:
This is a UVES/DIC1 programme on the bright SN2006X. The 3 identical OBs should be executed as soon as possible, since the SN is rapidly fading.
Ideally, the 3 OBs should be done during the same night, just one after the other.
If this is possible, spreading the OBs in different nights is still acceptable, but they still should be executed as close in time as possible, with a maximum difference of 3 nights between the first and the last OB.
README of this run:
Web version of approved README readme_76504800.html