275.C-5025A


Sicardy

NACO

Last update of this page: Wed Oct 7 15:41:04 2009


Run State: COMPLETED

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Special
Calibs
Time
Critical
DDT

Special Remarks:
TIMING IS PARAMOUNT! CALIBRATION TO BE DONE PRIOR TO PLUTO-CHARON.

Abstract for MTS:
This is a very time-critical observation, which can even be done in the event that the CONICA dark current is, well, not-so-dark. PLEASE NOTE that the calibrator OB would be better done with a JitterBoxWidth smaller than 4" but this was the smallest allowed by the IP in P2PP. Given the separation of the binary, perhaps 3" (or even 2") would be better. Adjust this, if possible, on-the-fly so as to keep both components of the calibration binary in the field for every exposure.


Run status page 275.C-5025A

README of this run:

Web version of approved README readme_75502500.html