Last update of the USG file: Apr 8 13:24:16 2005
Major Instrument Modes: ISAAC SWI Ks

RA Range: 18:08

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
0.6 2CLR 1.6 1.0 30.


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? Yes!


Special Remarks:
To be scheduled in June at the end of a night or before instr. switch (bright targets!)


 

Simple ISAAC SWI Ks of the magnetar candidate SGR1806 after an outburst
in December. Note that the field includes bright targets and that
the observations have to be SCHEDULED AT THE END OF A NIGHT OR BEFORE
AN INSTRUMENT SWITCH ! The DIT has manually been set to 2 sec.
This is a second epoch, which shall be scheduled in June and within
a few days to the corresponding NACO observations (run C).
The first epoch is foreseen for March.
 
 


Information about the progress of this run:

Run status page 274.D-5048D

README of this run:

274.D-5048D.README