RA Range: 06:59
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 2.0 1.0 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is a very simple DDT UVES/DIC1 programme which includes one single OB. This run (A) will be followed by another one (B), which will be carried out during P74. The PI asks to execute the OB as soon as possible, i.e. before the end of September. NOTE: the README contains an exceedingly long scientific introduction. Please, disregard it.
README of this run:
Finding charts are attached to the following OBs of this run:
| OB_ID | OB_name | Finding chart |
| OB:177624 | V524Mon_runA | 273.D-5058A.001.jpg |