272C5067A.html |
RA Range: 06h18m
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 5.0 1.0 30.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
FORS1 V and R band imaging of comet 9/P Tempel 1. The P.I. has requested that the FORS1 imaging be done simultaneously with Spitzer Space Telescope Infrared observations, scheduled between March 25 at 12 UT and March 27 at 03 UT. In view of the urgent nature of this DDT proposal, the OB and README file have been created by USG using the information included in the proposal. Apart from timing restrictions, no other constraints on observing conditions.
README of this run:
Check if ftp directory/ies exist/s for this run:
P71 Directory does not exist for 272.C-5067A
P72 Directory exists for 272.C-5067A
P73 Directory does not exist for 272.C-5067A