Major Instrument Modes: FORS1 LSS (fast)

RA Range: 12:48

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 4THK 5.0 1.0 0


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? No!


Special Remarks:
The OB should be done "as early as possible", as aked at Phase1.


 
 
Quick and easy fast LSS. Should be executed "as early as possible"
as specified at Phase 1.

The constraints couldn't be any looser (the one of a 0 distance
to the moon should not be taken too seriously, though...).

The slit is not marked on the FCs, but PA=0 is OK.

 
 


Information about the progress of this run:

Run status page 269.D-5014A

README of this run:

269.D-5014A.README