269D5014A.html |
RA Range: 12:48
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 4THK 5.0 1.0 0
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Quick and easy fast LSS. Should be executed "as early as possible" as specified at Phase 1. The constraints couldn't be any looser (the one of a 0 distance to the moon should not be taken too seriously, though...). The slit is not marked on the FCs, but PA=0 is OK.
README of this run: