266C5660A.html |
RA Range: 3:10
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0 2CLR 3.0 0.0 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Pre-imaging of moving targets to prepare run 266.C-5660(B). The relevant ephemerides are attached to the README file. RA, DEC and differential tracking rates have to be updated in the OB, whereas the PA should always be 0. The OBs contain large offsets and it is not a problem if the guide star is lost executing them. Time critical: the pre-imaging should be taken in July 2001 and the follow-up spectroscopy within few weeks after that. IMPORTANT: please release the data immediately to the PI to prepare the follow-up spectroscopy of run B. There are 2 OBs. They can be executed during separate nights, but within 2 weeks of each other. If executed back to back the re-acquisition can be skipped.
README of this run: